Development of the First Gas-Fired Combined Cycle Heat and Power Plant in the Republic of Macedonia

Cingoski, Vlatko (2002) Development of the First Gas-Fired Combined Cycle Heat and Power Plant in the Republic of Macedonia. In: Energy Forum 2002, 14-17 June 2002, Varna, Bulgaria.

[thumbnail of energien_forum.pdf]
Preview
Text
energien_forum.pdf - Published Version

Download (3MB) | Preview

Abstract

In this paper is talking about:
1. Background of the project
2. First Gas-Fired Combined Cycle Heat and Power Plant in the Republic of Macedonia
3. Basic Plan of the Gas Fired Combined Cycle Heat and Power Plant
4. Implementation plan
5. Required Funds and Financing
6. Environmental Contributions
7. Recommendations and Conclusions

Item Type: Conference or Workshop Item (Paper)
Subjects: Engineering and Technology > Electrical engineering, electronic engineering, information engineering
Engineering and Technology > Mechanical engineering
Divisions: Faculty of Electrical Engineering
Depositing User: Vlatko Cingoski
Date Deposited: 01 Oct 2013 14:31
Last Modified: 01 Oct 2013 14:31
URI: https://eprints.ugd.edu.mk/id/eprint/7591

Actions (login required)

View Item
View Item