Serafimovski, Todor and Barutskij, Vasilij and Filev, Kiril and Tasev, Goran (2013) Cu-Au valorization from poorly mineralized ore bodies in the Buchim copper mine, Eastern Macedonia. 13th International Multidisciplinary Scientific Geoconference SGEM 2013, 1. pp. 381-388. ISSN 1314-2704
Preview |
Text
Albena 2103 Buchim ore bodies.pdf Download (1MB) | Preview |
Abstract
Slightly over 30 years from the Buchim are exploited poor porphyry copper mineralizations. From calculated total ore reserves of around 120 Mt with 0.3% Cu and 0.3 g/t Au, calculated at the cut-off grade of 0.20% Cu, during last 33 years has been exploited 110 Mt of ore with an average copper concentration of 0.236%Cu and gold of 0.297 g/t Au and cut-off grade of 0.15% Cu. The present remaining exploitable ore reserves in the Buchim mine are around 40 Mt with 0.25% Cu and 0.245 g/t Au at cut-off grade of 0.15% Cu. The present economic parameters calculated at the Bunardzik ore body, as the newest ore body ready for exploitation have shown that minimal economic concentration of copper in the ore should be at least 0.2099% Cu, its service life should be approximately 4.5 years (calculated at Buchim’s annual production of 4Mt) and the value of the metal within it is approximatelly 289 millions US dollars. This is an information, which points out that these poor ore bodies within the Buchim mine undoubtely are providing profit with their exploitation.
Item Type: | Article |
---|---|
Subjects: | Natural sciences > Earth and related environmental sciences |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Goran Tasev |
Date Deposited: | 02 Jul 2013 07:34 |
Last Modified: | 15 Jan 2014 09:38 |
URI: | https://eprints.ugd.edu.mk/id/eprint/6744 |
Actions (login required)
View Item |