Despodov, Zoran and Gicev, Vlado and Doneva, Nikolinka (2007) Retrofit of a cavity formed during excavation using room and pillar mining "Svinja reka - West" part of "Sasa" mine. Book of Proceedings - Modern trends on underground construction. pp. 109-116.
Preview |
Text
Stup 07.pdf Download (3MB) | Preview |
Abstract
First we present stress-strain state of the rock of the rock massive around the cavity formed during room and pillar mining. The analysis is done using FEM. Further we analyze several materials for filling the existing cavity. Based on rational estimation, we choose appropriate backfill materials. Lattes, we do techno-economical analysis. Based on obtained results for expenses of the backfill material per m^3 we choose the optimal type of backfill material for the specific conditions including appropriate technology for filling the cavity.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | retrofit, cavity, backfill material |
Subjects: | Natural sciences > Other natural sciences |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Zoran Despodov |
Date Deposited: | 07 Dec 2012 12:55 |
Last Modified: | 15 Aug 2013 11:35 |
URI: | https://eprints.ugd.edu.mk/id/eprint/3174 |
Actions (login required)
View Item |