Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist

Doneva, Nikolinka and Despodov, Zoran and Mirakovski, Dejan and Hadzi-Nikolova, Marija and Mijalkovski, Stojance (2019) Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist. Podzemni radovi (34). pp. 1-9. ISSN YU 03542904

[thumbnail of Podzemni radovi_2019.VI_Nikolinka Doneva.pdf]
Preview
Text
Podzemni radovi_2019.VI_Nikolinka Doneva.pdf

Download (257kB) | Preview
Official URL: http://ume.rgf.bg.ac.rs

Abstract

This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.

Item Type: Article
Subjects: Engineering and Technology > Other engineering and technologies
Divisions: Faculty of Natural and Technical Sciences
Depositing User: Nikolinka Doneva
Date Deposited: 20 Aug 2019 13:08
Last Modified: 20 Aug 2019 13:08
URI: https://eprints.ugd.edu.mk/id/eprint/22343

Actions (login required)

View Item View Item