Doneva, Nikolinka and Despodov, Zoran and Mirakovski, Dejan and Hadzi-Nikolova, Marija and Mijalkovski, Stojance (2019) Two parametric functional dependents of time for construction of horizontal mining facilities in gneiss and schist. Podzemni radovi (34). pp. 1-9. ISSN YU 03542904
Preview |
Text
Podzemni radovi_2019.VI_Nikolinka Doneva.pdf Download (257kB) | Preview |
Abstract
This paper presents the analysis of the construction of horizontal mining facilities where 18 variants of mining facilities were developed. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Also the required time for construction of 1000 m' of the same facilities is calculated. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial compressive strength of rock mass and the size of the facilities` cross section.
Item Type: | Article |
---|---|
Subjects: | Engineering and Technology > Other engineering and technologies |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Nikolinka Doneva |
Date Deposited: | 20 Aug 2019 13:08 |
Last Modified: | 20 Aug 2019 13:08 |
URI: | https://eprints.ugd.edu.mk/id/eprint/22343 |
Actions (login required)
View Item |