Extensive Boiler Rehabilitation at TPP Bitola - Lessons Learned

Cingoski, Vlatko and Tanurkov, Dimitar and Papasterevski, Kosta (2017) Extensive Boiler Rehabilitation at TPP Bitola - Lessons Learned. In: XXXIII Savetovanje Energeticara Srbije - Energetika, 28-31 March 2017, Zlatibor, Srbija.

[thumbnail of TPP Bitola - originally submitted paper.pdf]
Preview
Text
TPP Bitola - originally submitted paper.pdf

Download (1MB) | Preview
[thumbnail of TPP Bitola rehabilitaiton.pdf]
Preview
Text
TPP Bitola rehabilitaiton.pdf

Download (2MB) | Preview

Abstract

Thermal Power Plant (TPP) Bitola is the largest lignite-based TPP in the Republic of Macedonia with three units put into operation in 1982, 1984 and 1988, respectively. All three units have already operated more than 200.000 hours each, therefore they are far beyond their normal life
expectancy. Thus, a large-scale rehabilitation program including extensive boiler rehabilitation of all three units, lignite supply chain modernization, steam turbines, generators and control system modernization, etc. was initiated. During rehabilitation, a special attention was paid that after the rehabilitation, all three units become fully compliant with the EU Directive for LCP Plants (EU
Directive 2001/80/EC).
In this paper, the authors present brief description of the extensive boiler’s rehabilitation program, the implemented technology, and some lessons learned during the process of rehabilitation. In addition, the achieved rehabilitation results are also given and discussed.

Item Type: Conference or Workshop Item (Paper)
Subjects: Natural sciences > Computer and information sciences
Engineering and Technology > Electrical engineering, electronic engineering, information engineering
Engineering and Technology > Mechanical engineering
Divisions: Faculty of Electrical Engineering
Depositing User: Vlatko Cingoski
Date Deposited: 21 Dec 2017 08:36
Last Modified: 21 Dec 2017 08:36
URI: https://eprints.ugd.edu.mk/id/eprint/18742

Actions (login required)

View Item View Item