Upgrade and application of automation system in t.s. 110/35/10 kV “Petrovec”

Sarac, Vasilija and Minovski, Dragan and Cogelja, Goran and Smitkova, Miroslava (2014) Upgrade and application of automation system in t.s. 110/35/10 kV “Petrovec”. In: International conference Power Engineering 2014, 21-23 May 2014, Slovakia.

Warning
There is a more recent version of this item available.
[thumbnail of Sarac-Minovski-Cogelja-Smitkova.pdf]
Preview
Text
Sarac-Minovski-Cogelja-Smitkova.pdf

Download (831kB) | Preview
[thumbnail of preliminary_event_schedule.pdf]
Preview
Text
preliminary_event_schedule.pdf

Download (282kB) | Preview

Abstract

35/10 kV substation Petrovec operated for many years as part of the power distribution network of Skopje, the capital of the Republic of Macedonia. Due to the increase of the consummation, the substation was upgraded on 110 kV voltage level. The upgrade of the substation included 110kV switchyard and replacement of the existing 35/10 kV switchyard with new enlarged indoor 35/10 kV switchgears. The project included installation of new automation system Sicam PAS for remote control of switchgear devices on 110 kV level as well as connection and data exchanging with local control system of 10 kV level. Another level of automation included installation of hardware and software solution for remote control and read out of protection relays. Complete hardware and software solution is product of company Siemens.

Item Type: Conference or Workshop Item (Paper)
Subjects: Engineering and Technology > Electrical engineering, electronic engineering, information engineering
Divisions: Faculty of Electrical Engineering
Depositing User: Vasilija Sarac
Date Deposited: 30 May 2014 07:31
Last Modified: 30 May 2014 07:31
URI: https://eprints.ugd.edu.mk/id/eprint/10013

Available Versions of this Item

Actions (login required)

View Item View Item