Panov, Zoran and Minov, Kirco and Boskovski, Dejan and Karanakova Stefanovska, Radmila and Popovski, Risto and Doneva, Blagica (2013) Synchronization of overburden dumping in Bucim open pit mine in function of minimal costs. XII National Conference with International participation of the open and underwater mining of minerals. pp. 81-83. ISSN 1314-8877
Preview |
Text
A-12-81-83.pdf Download (865kB) | Preview |
Abstract
Overburden exploatation in open pit “Bucim” is performed from 3 (three) ore bodies, with least 2 (two)
excavating zone. Overburden dumping is in 3 dump: two external and one internal. The need for
synchronization of work is imminent, given that it is the same transport machinery - 12 trucks.
In this paper it was made an attempt for mathematical modeling of synchronization of transporting and
overburden dumping in three dumps.
Item Type: | Article |
---|---|
Subjects: | Engineering and Technology > Other engineering and technologies |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Radmila Karanakova Stefanovska |
Date Deposited: | 10 Feb 2014 10:11 |
Last Modified: | 10 Feb 2014 10:11 |
URI: | https://eprints.ugd.edu.mk/id/eprint/9114 |
Actions (login required)
View Item |