Optimization of work of the excavator bucket wheel in exploitation of coal in the function of minimizing moving costs

Panov, Zoran and Zinzovski, Robert and Karanakova Stefanovska, Radmila and Popovski, Risto (2012) Optimization of work of the excavator bucket wheel in exploitation of coal in the function of minimizing moving costs. International Multidisciplinary Scientific GeoConference (SGEM'12), 1 (12). pp. 705-714. ISSN 1314-2704

[thumbnail of 3.40. OPTIMIZATION OF WORK OF THE EXCAVATOR BUCKET WHEEL IN EXPLOITATION OF COAL....pdf]
Preview
Text
3.40. OPTIMIZATION OF WORK OF THE EXCAVATOR BUCKET WHEEL IN EXPLOITATION OF COAL....pdf

Download (523kB) | Preview

Abstract

The purpose of this paper is to analyze and give a practical contribution to the necessary optimization of work of the excavator bucket wheel in exploitation of coal in function of minimizing the costs to relocate the exact definition of the optimal technological schemes of work, excavator SRs 1050 as the newest excavator unit which is work in MU Mines Suvodol- Bitola and it works on the new site layer of underground lignite coal series, and to show that by using certain technical solutions for tracking and positioning of the excavator we can achieve significant reduction in time of the planned delays this would be achieved reducing production costs. With a practical example in the real operating conditions we can perform the reduction of costs which would make way for future to implement the same system and other excavator units.

Keywords: positioning control, optimization, technological schemes of work, displacement

Item Type: Article
Subjects: Engineering and Technology > Other engineering and technologies
Divisions: Faculty of Natural and Technical Sciences
Depositing User: Zoran Panov
Date Deposited: 14 Dec 2012 09:17
Last Modified: 14 Dec 2012 09:17
URI: https://eprints.ugd.edu.mk/id/eprint/3607

Actions (login required)

View Item View Item