Fidancev, Boris and Zendelska, Afrodita (2025) New sag-ball mill and flotation line for reconstructing of “Zletovo” Flotation Plant - Probishtip, North Macedonia. In: XVI International Mineral Processing And Recycling Conference, 28 - 30 May 2025, Belgrade, Serbia.
![IMPRC_2025_Proceedings - converted.pdf [thumbnail of IMPRC_2025_Proceedings - converted.pdf]](https://eprints.ugd.edu.mk/style/images/fileicons/text.png)
IMPRC_2025_Proceedings - converted.pdf
Download (1MB)
Abstract
"Zletovo” Lead and Zinc Flotation Plant has existed for more than 50 years and for the future profitable work of “Zletovo” Mine, reconstruction is necessary to increase the annual capacity of the mine production and ore processing from 150 to 350 kt/y, as well as increase the technological quantitativequalitative results. To achieve those goals, in the current reconstruction of “Zletovo” Lead and Zinc Flotation Plant, with including a “New SAG Ball Mill and Flotation Line” is expected to be achieved replacement of the existing old and dilapidated crushing, grinding and flotation as well as and to increase the technological quantitative-qualitative results. The current reconstruction of "Zletovo” Mine, is meant to increase the mine's annual capacity and ore processing by introducing the “New SAG-Ball Mill and Flotation line”, with an investment of up to US$15M, the annual profit will reach up to US$25M or more.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | Engineering and Technology > Other engineering and technologies |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Afrodita Zendelska |
Date Deposited: | 12 Jun 2025 09:16 |
Last Modified: | 12 Jun 2025 09:16 |
URI: | https://eprints.ugd.edu.mk/id/eprint/36044 |