Peltekovski, Zlatko and Serafimovski, Dalibor and Tasev, Goran and Serafimovski, Todor (2022) Micromine calculations of ore reserves in the Borov Dol porphyry copper deposit, Republic of North Macedonia. Geologica Macedonica, 37 (1). pp. 49-63. ISSN 0352-1206
Text
Peltekovski et al GM 37 No1 complete.pdf Download (2MB) |
Abstract
The calculations of ore reserves in the Borov Dol deposit were mainly carried out with the support of the AutoCAD software package, and those results received official confirmation in the Republic of North Macedonia. The latest calculation using MICROMINE provides a wider range of use of source data from detailed geological surveys and rapid correlation between metals and associated elements in the deposit. The MICROMINE procedure for the calculation of ore reserves in the Borov Dol deposit consists of several stages starting from: creation of new project and related data base (Excel and Micromine), Micromine database validation process, building and creating wireframe, creation of the particular block model as well as calculation of ore reserves by MICROMINE software package. The obtained results are highly correlative and compatible with the same obtained through the method of vertical parallel profiles calculated using the AutoCAD software package (difference 1.21%).
Item Type: | Article |
---|---|
Subjects: | Natural sciences > Earth and related environmental sciences |
Divisions: | Faculty of Natural and Technical Sciences |
Depositing User: | Goran Tasev |
Date Deposited: | 19 Jun 2023 12:46 |
Last Modified: | 19 Jun 2023 12:46 |
URI: | https://eprints.ugd.edu.mk/id/eprint/31911 |
Actions (login required)
View Item |