Comparison of some parameters from the old and the new control system in mine Bucim

Cekerovski, Todor and Zivanovic, Jordan and Despodov, Zoran (2011) Comparison of some parameters from the old and the new control system in mine Bucim. Proceedings of the XI-th national conference with international participation of the open and underwater mining of minerals. pp. 187-194.

[thumbnail of trud_Tose-Varna.pdf]
Preview
Text
trud_Tose-Varna.pdf

Download (14MB) | Preview

Abstract

In 2010 in mine Bucim was ongoing implementation of integrated control system, named Skylinks, produced
by NAOK EOOD Sofija. The system is used in several open-mining mines in Bulgaria and other neighboring
countries and has shown very good results.
Testing period in Bucim started from the mid of year 2010. Big amount of information are stored in base which
is constantly filled. One part of the information is available for the dispatchers and the employers.
In this article we have made analysis which compares the information, which previously were collected and
processed manually, and the information collected automatically by the Skylinks system, with special overview
of the parameter transport of the ore and barren soil and measured distances.

Item Type: Article
Uncontrolled Keywords: mine Bucim, Skylinks, transport
Subjects: Natural sciences > Other natural sciences
Divisions: Faculty of Natural and Technical Sciences
Depositing User: Todor Cekerovski
Date Deposited: 07 Dec 2012 13:00
Last Modified: 18 Jun 2013 10:19
URI: https://eprints.ugd.edu.mk/id/eprint/3186

Actions (login required)

View Item View Item