Doneva, Nikolinka and Hadzi-Nikolova, Marija and Mijalkovski, Stojance (2019) Analysis of required construction time for drift in rock type – lead and zink ore. Natural resources and technology, 13 (13). pp. 5-9. ISSN 185-6966
3065-Article Text-5589-1-10-20191022.pdf
Download (1MB)
Abstract
This paper presents the analysis of the construction of drift, as a horizontal mining facility. The 9 variants drift construction, in rock type lead-zinc ore were formed. Assumed length of objects in all variants was 1000 m '. The aim of this research was to determine the required time for construction of all variants and then to reduce it to the time required for construction of 1 m` per facilities. Based on analysis, two parametric functional dependents of construction time are determined in relation of uniaxial rock mass compressive strength and the size of the facilities` cross section.
| Item Type: | Article |
|---|---|
| Subjects: | Engineering and Technology > Other engineering and technologies |
| Divisions: | Faculty of Natural and Technical Sciences |
| Depositing User: | Nikolinka Doneva |
| Date Deposited: | 12 Oct 2021 07:21 |
| Last Modified: | 12 Oct 2021 07:21 |
| URI: | https://eprints.ugd.edu.mk/id/eprint/22738 |
