The optimal parameters determination of drilling in the Kosovo motorway project in Bellanica

Frasher, Brahimaj and Dambov, Risto (2019) The optimal parameters determination of drilling in the Kosovo motorway project in Bellanica. In: XV International Conference of the Open and Underwater Mining of Minerals, 03-06 June 2019, Varna, Bulgaria .

[thumbnail of PRV TRUD - VARNA  2019.pdf]
Preview
Text
PRV TRUD - VARNA 2019.pdf

Download (1MB) | Preview

Abstract

Drilling geometry parameters are of great importance when performing highway construction work, because
this directly affects the volume of work to be performed and at the time of performing these works. The right
determination of the drilling parameters will reduce the specific charge of explosive and increase the mined
volume for drilling length. With the determination of drilling angle, it has been achieved to decrease the specific
charge of explosive from 0.59 kg/m3 to 0.49 kg/m3 and to increase the mined volume for drilling length from
6.533 m3/m to 7.467 m3/m.
Keywords: Blasting, specific charge, angle, volume, drilling.
Introduction

Item Type: Conference or Workshop Item (Paper)
Subjects: Engineering and Technology > Civil engineering
Engineering and Technology > Other engineering and technologies
Divisions: Faculty of Natural and Technical Sciences
Depositing User: Risto Dambov
Date Deposited: 03 Oct 2019 11:36
Last Modified: 03 Oct 2019 11:36
URI: https://eprints.ugd.edu.mk/id/eprint/22628

Actions (login required)

View Item View Item