Comparison of some parameters from the old and the new control system in mine Bucim

Cekerovski, Todor and Zivanovic, Jordan and Despodov, Zoran (2011) Comparison of some parameters from the old and the new control system in mine Bucim. In: Proceedings of the XІth National conference with international participation of the open and underwater mining of minerals, 19-23 June 2011, Varna, Bulgaria.

[thumbnail of Varna (1).pdf]
Preview
Text
Varna (1).pdf

Download (2MB) | Preview

Abstract

In 2010 in mine Bucim was ongoing implementation of integrated control system, named Skylinks, produced
by NAOK EOOD Sofija. The system is used in several open-mining mines in Bulgaria and other neighboring
countries and has shown very good results.
Testing period in Bucim started from the mid of year 2010. Big amount of information are stored in base which
is constantly filled. One part of the information is available for the dispatchers and the employers.
In this article we have made analysis which compares the information, which previously were collected and
processed manually, and the information collected automatically by the Skylinks system, with special overview
of the parameter transport of the ore and barren soil and measured distances.

Item Type: Conference or Workshop Item (Paper)
Subjects: Engineering and Technology > Electrical engineering, electronic engineering, information engineering
Divisions: Faculty of Computer Science
Depositing User: Todor Cekerovski
Date Deposited: 20 Apr 2018 12:14
Last Modified: 20 Apr 2018 12:14
URI: https://eprints.ugd.edu.mk/id/eprint/19860

Actions (login required)

View Item View Item