35/10 kV substation Dracevo operated for many years as part of the power distribution network of Skopje, the capital of the Republic of Macedonia. Due to the increase of the consummation, the substation was upgraded on 110 kV voltage level. The upgrade of the substation included 110kV switchyard and replacement of the existing 10kV switchyard with new enlarged indoor 10 kV switchgear. The project included installation of new automation system Sicam PAS for remote control of switchgear devices on 110 kV level as well as connection and data exchanging with local control system of 10 kV level. Complete hardware and software solution is product of company Siemens.

Item Type: Conference or Workshop Item (Paper)
Subjects: Engineering and Technology > Electrical engineering, electronic engineering, information engineering
Divisions: Faculty of Electrical Engineering
Depositing User: Vasilija Sarac
Date Deposited: 17 Sep 2013 07:45
Last Modified: 17 Sep 2013 07:45
URI: http://eprints.ugd.edu.mk/id/eprint/7381

Actions (login required)

View Item View Item